Study about lithium in Manitoba from Snow Lake Resources

Studio sul litio in Manitoba da Snow Lake Resources

Snow Lake has commissioned a scoping study to assess the proposed creation of a Lithium Hydroxide Plant in South Manitoba, Canada.

The study is a strategically important step towards creating North America’s first fully renewable and fully electric, integrated lithium processing operation which is crucial for the future of the electric vehicle industry.

Studio sul litio in Manitoba da Snow Lake ResourcesStarting in April 2022, the scoping study will accelerate the company towards commercialized lithium production from both Snow Lake Lithium’s mine and the proposed lithium hydroxide plant in CentrePort Canada in Southern Manitoba. The study will identify the technologies, innovations, skills and potential partners required to deliver a world-class lithium hydroxide plant within the Manitoba province. 

Just 700km from CentrePort Canada, Snow Lake Lithium is creating the world’s first all-electric, fully renewable lithium mine. The addition of a lithium hydroxide plant will enable the seamless integration of the domestic supply of this critical resource to the North America electric vehicle industry. 

The plant’s proposed location is CentrePort Canada, North America’s largest trimodal inland port and Foreign Trade Zone. CentrePort Canada connects to major national and international trade gateways as well as being the only inland port in Canada with direct access to trimodal transportation – truck, rail and air cargo. This unique location means that Snow Lake Lithium is connected to all the major auto manufacturers across North America, reducing supply chain costs and emissions as well as delivering a secure and seamless lithium supply chain from rock to road.  CentrePort Canada offers 20,000 acres of high-quality, affordable industrial land and benefits from its strategic geographic location in Winnipeg, Manitoba and the Rural Municipality of Rosser, within the capital region of Winnipeg.

Studio sul litio in Manitoba da Snow Lake Resources
Philip Gross, CEO of Snow Lake Lithium

Snow Lake Lithium has contracted Primero to deliver the Scoping Study of the Lithium Hydroxide Plant in Southern Manitoba.  Primero brings world-class, hands-on lithium experience through its vertically integrated project management across the global resources industry.

Snow Lake Lithium currently has an 11.1 million metric tonnes indicated and inferred resource at 1% Li2O with plans to expand the resource based on the current active drilling campaign as previously announced in the recent winter drilling program update (March 10, 2022 – Snow Lake Announces Significant Progress Update for Winter Drilling Campaign).

The scoping study started in April 2022 and is expected to be completed by Spring 2023. In parallel with this, Snow Lake Lithium will will continue its engineering evaluation and drilling programme across its Thompson Brothers Lithium Project site, with the expectation that the mine will transition to commercial production in late 2024.

Source: Snow Lake Resources Ltd.

Be the first to comment

Leave a Reply

Your email address will not be published.


*


This site uses Akismet to reduce spam. Learn how your comment data is processed.